Project Portfolio

From emergency derailment response and track repairs to full-scale road-building and flat-car bridge installations, explore the featured projects that showcase our commitment to safety, responsiveness, and innovative solutions.

rock crushing capabilities

Millwood Properties

Madras, California – March 2025

RFC rebuilt 300 feet of track, rehabilitated the No. 7 switch, and added safe, accessible walkways meeting California standards.

Klamath Northern Railroad Rail Upgrade

Gilcrest, Oregon – June to September 2024

RFC replaced 1.6 track miles of 68-lb rail with 132-RE rail in an environmentally sensitive area, and installed 750 new cross-ties to surface, line, and dress the track for long-term stability.

pile of rock with belt equipment
rock being delivered and unloaded

Oregon Rail Heritage Center Turntable and Track Installation

Portland, Oregon – Summer 2023

RFC constructed four new tracks totaling 600 feet, installed a No. 8 switch, and completed installation of a turntable bridge track.

Klamath Northern Railroad Tie Installation

Gilcrest, Oregon – May to June 2023

RFC installed 6,200 ties across 11 miles of short-line track to enhance safety and performance. The project included 1,000 tons of ballast rock, along with full surfacing, lining, and dressing.

piles if rock crushed to different sizes
rock crushing equipment in action

Christensen Inc. Track Rehabilitation

Portland, Oregon – December 2023

RFC rebuilt the No. 9 switch and 75 feet of adjoining track at a hazardous materials facility following a derailment. The project included all new switch ties and select rail components installed to meet FRA and Class I standards.